Asbestos and asbestos cement removal in Donostia-San Sebastián

Asbestos cement is removed with an approved work plan. Not with a skip.

Removal of asbestos cement roofs, downpipes and tanks in line with the regulations, leaving the new roof in place with the paperwork done. We work in Donostia, Irún and Navarra.

Asbestos cement roofs
Work plan
Waste management
New roof
Retirada de placas de fibrocemento de una cubierta por un operario con guantes

What asbestos removal requires

It is not a demolition. It is a procedure.

Asbestos cement is regulated. Removing it requires a licensed contractor, an approved work plan, protection for the workers and an authorised waste handler.

01
Identification

We confirm that the material contains asbestos and what condition it is in.

02
Work plan

It is drawn up and submitted to the labour authority before the material is touched.

03
Controlled removal

Dismantling without breaking the sheets, with the material protected and sealed.

04
Waste and new roof

Transport to an authorised waste handler with its paperwork, and the new roof installed.

Regulations

It is done the way the law says, or it is not done.

Asbestos removal is governed by Spanish Royal Decree 396/2006: a contractor entered in the corresponding register, an approved work plan and an authorised waste handler. We coordinate the whole procedure and the roof that replaces what is removed.

What gets done wrong with asbestos cement

Breaking an asbestos cement sheet is the mistake you cannot undo.

The danger of asbestos cement is in the fibres it releases when it breaks. That is why it is not demolished, not cut and not thrown into a skip.

01
Removing it without a plan

Without an approved work plan there is no authorisation to touch the material. It is an offence and a risk for whoever does it.

02
Breaking the sheets

Cutting or breaking asbestos cement releases fibres. It is taken down whole, dampened and sealed.

03
Leaving the waste anywhere

Asbestos cement goes to an authorised waste handler, with its identification document. Not into a builders skip.

From start to finish

Five steps to remove asbestos cement.

Identification, plan, removal, waste management and new roof. None of them is skipped.

01
Site visit

We look at the roof or the element and confirm that it is asbestos cement.

02
Work plan

The plan is drawn up and submitted to the labour authority.

03
Removal

Controlled dismantling with protection, without breaking the material.

04
Waste management

Transport and delivery to an authorised waste handler, with the paperwork.

05
New roof

We install the roof that replaces the one removed and hand over the documentation.

What the job includes
Placas de fibrocemento retiradas y casco de proteccion junto a planos de obra

Clear responsibility

Removal and new roof. One single job.

The asbestos removal and the roof that replaces it are coordinated together. You are not left with an open roof between two companies.

01
The whole procedure

Plan, removal and waste, with the paperwork that evidences each step.

02
The roof that follows

Waterproofing, insulation and new covering, in the same job.

03
The building permit

If the new roof needs a permit, we handle it.

The work plan is authorised by the labour authority and the waste is received by an authorised handler. Neither timescale is in our hands, and we explain them at the visit.

FAQs

What is worth knowing beforehand.

Every town and every building can change the answer. For a specific case, call us and we will look at it.

Asbestos cement made before asbestos was banned usually contains it. We check at the visit and, if necessary, with a lab analysis of the material.

No. Removing asbestos material requires a licensed contractor, an approved work plan and specific protective equipment. Doing it without that is both a risk and an offence.

The document setting out how the material will be removed, with what equipment and what protection. It is submitted to the labour authority and you have to wait for its approval before starting.

To a waste handler authorised for asbestos, with its identification document. We give you the paperwork for the delivery.

Yes. Removal and new roof go in the same job, with whatever building permit applies.

In practice yes. Uralita is the brand name asbestos cement is known by in Spain; asbestos removal is the technical name of the job. The procedure and the paperwork are the same.

Yes. We work in Donostia, Irún and Navarra.

Request a quote

Tell us what you have made of asbestos cement.

With the address, the type of element and a few photos we can price the removal and the new roof.